Bulk Earthworks

Project One

  • Mass cuttings and material haulage
  • Forming of Embankments
  • Bulk excavation of settlement pond networks
  • Mass rock breaking inclusive of shaping embankments and berms
  • Road formation Box cutting’s
  • Final trimming of carriageway sub-base
  • Preparation of Landscape area’s

Project Two

  • Verge fill – 30,000 cubes of class 2 fill to be used in verge fill
  • Bulk excavation – 700,000 cubes to be excavated
  • Deposition – 700,000 cubes excavated to be deposited and compacted
  • Processing – rock-breaking operations and screening of material – 200,000 cubes of rock to be crushed
  • Haulage of materials – Over one million cubes of materials to be moved
  • Topsoiling – 170,000 cubes of topsoil to be used to topsoil bunds and structures
  • Shaping and trimming batters –
  • Box cut in preparation for type 1 – 7KM of box cut and type 1 on m