- Pre-Earthworks Ditch excavation and lining inclusive of outfalls and land drain interception
- Implementing temporary control measures for surface run-off
- Installation of 64,500Lm of mainline carriageway drainage in 2017 alone
- Structural back of wall drainage
- Constructing Bridge deck drainage solutions
- Combined drainage kerb network installations and sump outfalls
- Embankment slope drainage
- Construction of Attenuation Tanks





